
4.75 mm reinforced Aristech® acrylic. Balboa Water Group® control system. Continuous-flow swim current. 1.5 m depth. Specified for permanent outdoor installation.
4 m, 5 m or 5.95 m configurations · Full stainless steel chassis
The Tide is designed as a permanent outdoor swim spa installation for private residences, hospitality settings and estate environments. It combines a continuous-flow swimming system with a pressurised hydrotherapy jet section within a single reinforced structure.
The 1.5 m depth supports a full swimming stroke — a defining specification that distinguishes this model from standard swim spas at 1.2 m depth.
A permanently installed swim spa defined by continuous-flow current, 1.5 m depth and reinforced Aristech® acrylic construction.
Materials, configuration, site assessment and delivery scope are confirmed in writing before manufacture begins. Site assessment is a required step — not optional.
The filled operating weight of the largest configuration (5.95 m) is approximately 12,840 kg. A reinforced concrete foundation of at least 15 cm is the standard requirement.
The Tide is constructed on a 4.75 mm reinforced Aristech® acrylic shell — structurally necessary at this scale given the load of up to 10,800 litres of water. The shell is supported by a full stainless steel chassis for torsional rigidity.

The continuous current is generated by river nozzles integrated into the swim end wall. These produce a constant, laminar flow stream strong enough for uninterrupted swimming without turning.


The spa end features an ergonomic seating zone with hydrotherapy jets positioned for shoulders, back, thighs, calves and feet. Integrated LED lighting and Bluetooth audio are included across all configurations.
Two performance profiles define the S-series. The M and L-series increase swim length and hydraulic capacity.
All configurations share the same 2.4 m width, 1.5 m depth, 4.75 mm reinforced Aristech® acrylic shell and full stainless steel chassis.
Reinforced concrete foundation — minimum 15 cm thickness, sized to the unit footprint. Load specifications are provided for the contractor or project architect during specification.
A dedicated water supply and appropriately sized drainage are required. A full water change on the 5.95 m model involves removing 10,800 litres.
Shipping crate weighs 2,040 kg gross. Crane placement is required for all configurations. Vehicle access for crane truck must be available within practical distance of the installation point. Access is assessed during the specification stage.
The Tide is shipped in a reinforced industrial export crate engineered for the scale and weight of a full swim spa. Crane logistics are coordinated as part of every delivery. Delivery terms are confirmed per destination prior to production approval.

The Tide is manufactured in a production facility holding the following independently audited certifications. These are factory-level certifications, not OxiusPro brand claims.
Exact warranty terms are stated in the written specification. After the warranty period, servicing, maintenance and replacement parts are arranged at the owner's cost.
Due to the scale and weight of this swim spa, the specification process is more extensive than for smaller models. Site assessment is a required step before configuration is confirmed.
Configuration, site conditions and structural requirements are assessed and defined.
A pro forma invoice is issued with full specification, confirmed pricing and delivery scope.
Production begins after written approval and deposit confirmation.
Crane logistics, placement and installation are coordinated per destination and project scope.
The 1.5 m depth and continuous-flow river nozzle system. The depth supports a full swimming stroke, which standard swim spas at 1.2 m depth cannot.
Subject to structural verification. The filled operating weight of the largest model is approximately 12,840 kg. Structural engineer confirmation is required.
With up to 5 pumps of 3 HP each, 15 A is insufficient for full simultaneous operation. A 32 A / 3-phase dedicated circuit ensures stable performance.
Yes. Site assessment is a required step before configuration is confirmed. Structural viability, crane access and foundation requirements are defined before specification is finalised.
The manufacturer states 5+ years on the shell structure and 12 months on electronics. After the warranty period, servicing, maintenance and replacement parts are arranged at the owner's cost.
Prices apply to base configurations. Delivery, duties, customs clearance, crane logistics, site placement and installation are confirmed separately per destination and project scope.
Submit your configuration, site details and destination requirements. Specification, pricing and delivery scope are confirmed in writing prior to production.
From USD 48,500
Submit EnquiryEvery order begins with written specification. No manufacture proceeds without your approval.